Formwork Systems
 

Company History

 
  • 2007

    2007

    MEVA launches new climbing systems: MEVA Automatic Climbing MAC and MEVA Guided Climbing MGC at the international BAUMA expo in Munich, Germany

     
  • 2006

    2006

    Record-breaking heights of over 12 m achieved with the Support Frame STB - using flowable concrete

     
  • 2005

    2005

    MEVA introduces StarTec Securit as the most up-to-date answer to the highest working safety requirements

     
  • 2004

    2004

    MEVA introduces the heavy duty Mammut 350 system with the highest load capacity ever - 100 kN/m². It represents the premium standard in wall formwork

     
  • 2003

    2003

    The foldable and movable column formwork CaroFalt is launched, marking new levels of speed, efficiency and safety

     
  • 2001

    2001

    MEVA is the first to introduce a clamp system in feet and inch to the USA. The Imperial position establishes itself as the leading heavy-duty system on the continent.

     
 
 
top
 © MEVA Schalungs-Systeme GmbH