MEVA HISTORY

MEVA Milestones

2014
2014
The modular safety system SecuritBasic complies with all international safety standards.
2013
2013
4th October 2013: company founder Gerhard Dingler hands over MEVA to Florian F. Dingler.
2012
2012
Automatic climbing system MAC. First time on a European project in Basel, Switzerland.
2010
2010
alkus repair demo at bauma 2010. Panel with 1012 pours is presented.
2008
2008
The Burj Khalifa, Dubai, built to level 154 at over 600 m with the MevaDec. No re-facing.
2007
2007
First ever warranty on facing. Never been claimed, nowhere in the world.
2006
2006
The new all-in-one safety system StarTec-Securit. It turns the StarTec into a premium safety solution.
2005
2005
MevaLite with its all-plastic facing sets the pace in hand-set formwork in the US.
2004
2004
MEVA completes the change-over to the all-plastic facing alkus in all its formwork systems.
2003
2003
To this day toughest heavy-duty formwork with a load capacity of 100 kN/m²
2001
2001
MEVA develops a system for the US market, in feet and inch and with tie-off bars.
2000
2000
The first 100 % wood-free facing alkus is unveiled. It stops plywood waste.
1999
1999
High technology frame coating to offer optimum corrosion protection.
1995
1995
MEVA is one of the first in the industry to indroduce a certified and audited quality management system.
1994
1994
The shoring system MEP introduces better safety and effectiveness to the building site.
1992
1992
MevaDec is the first slab formwork system with 3 methods in one system for all slabs.
1990
1990
The support frame STB allows for single-sided forming and holds the record with 14 m.
1989
1989
Multi-purpose systems for crane-dependent and hand-set works: StarTec/AluStar.
1982
1982
The first large-size heavy duty panel system with 97 kN/m² load capacity.
1981
1981
The first ever modular, hand-set aluminium panel formwork for both walls and slabs.
1977/78
1977/78
The world‘s first hollow profile and birth of the formwork clamp. Both today‘s industry standard.
1971
1971
Presented at bauma 1971 in Munich: the first modular panelised formwork system.
1970
1970
MEVA founded on February 6th,1970. MEVA is an acronym for the German word for metal processing.
 
 
2014
The modular safety system SecuritBasic complies with all international safety standards.
1
2013
4th October 2013: company founder Gerhard Dingler hands over MEVA to Florian F. Dingler.
2
2012
Automatic climbing system MAC. First time on a European project in Basel, Switzerland.
3
2010
alkus repair demo at bauma 2010. Panel with 1012 pours is presented.
4
2008
The Burj Khalifa, Dubai, built to level 154 at over 600 m with the MevaDec. No re-facing.
5
2007
First ever warranty on facing. Never been claimed, nowhere in the world.
6
2006
The new all-in-one safety system StarTec-Securit. It turns the StarTec into a premium safety solution.
7
2005
MevaLite with its all-plastic facing sets the pace in hand-set formwork in the US.
8
2004
MEVA completes the change-over to the all-plastic facing alkus in all its formwork systems.
9
2003
To this day toughest heavy-duty formwork with a load capacity of 100 kN/m²
10
2001
MEVA develops a system for the US market, in feet and inch and with tie-off bars.
11
2000
The first 100 % wood-free facing alkus is unveiled. It stops plywood waste.
12
1999
High technology frame coating to offer optimum corrosion protection.
13
1995
MEVA is one of the first in the industry to indroduce a certified and audited quality management system.
14
1994
The shoring system MEP introduces better safety and effectiveness to the building site.
15
1992
MevaDec is the first slab formwork system with 3 methods in one system for all slabs.
16
1990
The support frame STB allows for single-sided forming and holds the record with 14 m.
17
1989
Multi-purpose systems for crane-dependent and hand-set works: StarTec/AluStar.
18
1982
The first large-size heavy duty panel system with 97 kN/m² load capacity.
19
1981
The first ever modular, hand-set aluminium panel formwork for both walls and slabs.
20
1977/78
The world‘s first hollow profile and birth of the formwork clamp. Both today‘s industry standard.
21
1971
Presented at bauma 1971 in Munich: the first modular panelised formwork system.
22
1970
MEVA founded on February 6th,1970. MEVA is an acronym for the German word for metal processing.