Project: Medical Centre - Miami Valley Hospital - in Dayton, OH, 5 cores

Contractor: Baker Concrete

MEVA Systems: Heavy-duty wall formwork Imperial and leight-weight wall formwork MevaLite, Climbing Scaffold KLK, Shoring System MEP

Formwork Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 

Project

MEVA Formwork Solution for Medical Centre Dayton, OH

Building the five new cores that form the heart of Dayton´s Miami Valley Hospital presented a true scheduling challenge: They had to be erected simultaneously to keep ahead of the structural steel. 

Since the rebar content was very dense, the supervisors had to take great care to tie in with the structural iron.

The configuration of the cores required extra decking to be provided by MEVA and custom parts were required to solve the issues with erecting the formwork. 

MEVA engineers provided a safe working platform using the climbing platform KLK and MEVA flipper locks.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.