PROJECT DATA

NEF National Enrichment Facility with more than 150,000 ft² MEVA wall formwork

Project: National Enrichment Facility, in Eunice, New Mexico, USA

Contractor:
Washington Group, Rust Contractors (construction company)

MEVA Systems
107,500 ft² heavy-duty wall formwork Imperial
43,000 ft² leight-weight wall formwork MevaLite
more than 700 climbing scaffolds KLK

Formwork Engineering: MEVA Formwork Systems, Springfield, Ohio

 
 
1
2
3
4
5
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.