PROJECT DATA

Saadiyat Island off Abu Dhabi City, UAE

Project: Building of a new sewage treatment plant with biological tanks

MEVA Systems: Heavy-duty formwork Mammut 350, column formwork CaroFalt

Main Contractor: Kharafi National LLC
Subcontractor: Civiltech General Contracting Co. LLC AL Nasr General Contracting Fourth Dimension General Contracting 
Client: TDIC

Formwork Engineering: MEVA KHK, Dubai

 
 
1
2
3
4
5
 

Project

Formwork solution for the island´s large-scale infrastructure project

A mixed commercial, residential and leisure project is under construction on Saadiyat island located 500 m off Abu Dhabi. The island will feature many world class resorts, museums and universities. It is expected to be completed in 2020. MEVA KHK in Dubai were consulted to design and provide a comprehensive formwork solution for the island´s large-scale infrastructure projects.

Part of the project is the building of a new sewage treatment plant with biological tanks. The project encompasses the following concrete structures:

  • Main Storage Tanks
  • Biological Tanks
  • MBR Gallery
  • Equalization Tanks
  • Pre-Treatment Plant
  • Main Pumping Station
  • Workshop

MEVA KHK Solution

  • 3500 m² of Mammut 350 wall formwork
  • 6.6 m high CaroFalt column formwork for the construction of the main storage tanks
  • Custom-tailored rails designed and manufactured by MEVA KHK facilitate the change of thickness perimeter and dividing walls of the storage tanks (6.6 m high) and biological tanks (8.0 m high).
  • The 9.0 m perimeter walls stepped in on the external face from 900 mm at base to 400 mm at 3.5 m.
  • The dividing walls incline 250 mm at 3.5 m height to 4.0 m height on both sides.
  • The equalization tank walls, 9.0 m high and 80 cm thick, were poured to full height in one pour with 0 mm deflection.

The contractors were especially pleased with the stability and robustness of the formwork and the 0 mm deflection achieved on the high walls that were poured to full height in just a single pour.

Kharafi National LLC´s Senior Civil Engineer said that given the performance and service on this project, MEVA KHK will definitely be used on future projects!

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.