PROJECT DATA

Proton Therapy Centre with wall thickness of 28 ft and slab thickness of 10 ft

Project:  Proton Therapy Centre, Houston, Texas
28 ft wall thickness, 10 ft. slab thickness, 102,257 ft² floor area

MEVA Systems: MEVA heavy-duty wall formwork Imperial with 2,025 psf load capacity

Concreting Specifications: 

  • 3,000 mixer loads of concrete delivered in 10 minutes intervals
  • 300 cubic yards (8122 ft3) of concrete poured every hour
  • 2 concrete pumps running at max. performance (140-160 instead of the normal 90-100 cy/h)

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Large construction site in the heart of Budapest

    Large construction site in the heart of Budapest

    MEVA fulfils stringent requirements with flexible formwork solutions. The Budapest Zoo & Botanical Garden is one of the Hungary’s most popular cultural attractions.

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.